Write FAQ copy
Assignee: Jun
Kanban Project Board
A three-stage card board that runs in your browser. Autosave, shared editing and schedule prediction are not provided.
JSON includes cards and up to 500 recent changes. CSV includes activity only. Save before leaving this tab.
Drag cards or use their direction buttons. With a card focused, Alt+Left/Right changes status and Alt+Up/Down changes order.
Assignee: Jun
Assignee: Mina
Check mobile navigation too
Drop a card in this column.
The latest 30 entries appear here. The CSV and project JSON include up to 500 retained entries.
Make task cards and place them in Backlog, In Progress or Done on a small project board. A per-column work-in-progress limit blocks additions and moves that would exceed it. You can reorder cards and review when changes happened. Save a file and import it again later; there is no account or synchronization server.
A positive integer per column blocks card creation or movement above the limit. A blank value means unlimited. Reducing the limit below the current count is also rejected. The limit does not calculate staff availability or a completion date.
Focus a card and press Alt+Left/Right to change columns or Alt+Up/Down to reorder in a column. Every card also has direction buttons available with Tab and Enter/Space.
No. The board stays in this page's browser memory. Download its project JSON before closing the tab, then import it on your next visit. There is no account, share link or real-time collaboration.
Only strict local-kanban-board-v1 JSON is accepted, and a valid file replaces the whole board. The importer checks size, field shape, duplicate card IDs, statuses, WIP and history sequence. An error leaves the current board intact. Inspect untrusted files before use.
The project keeps only the latest 500 entries. Older entries drop away when new changes are made, so download JSON or CSV periodically if you need a longer record. This is an informational activity log in a user-editable file, not tamper-proof evidence.
This tool tracks card transitions, per-column WIP and activity. The notepad stores free-form prose; the Gantt planner computes dates from durations and dependencies. This board does not predict schedules or resource capacity.
Project content is processed only in this page's browser memory and is not sent to a server. There is no autosave, so download the JSON before closing the tab. The file includes card titles, assignees, descriptions and activity history.
Comments & questions